Location: Tønsberg, Norway
Year: 2017
Developer: –
Client: Atendi AS

Project managerKim Ekblad, +46 72-552 18 19

We helped Greveskogen school in Tønsberg with installing a new lifting system and a divider in their school cafeteria.

The lifting system installation included 3 motorized trusses lifted by 6 GIS chain hoists coupled with our FlexControl-B system.

The divider was constructed to work as a roman curtain being lifted by a FlexPile winch.

Used products

  • FlexPile
  • FlexControl-B
  • GIS LPM250 chain hoists